Central Civil Construction has completed dozens of projects for businesses and government organizations in South Florida. Central Civil capabilities include: airport construction; seaport construction; utility/infrastructure construction; environmental construction; highway construction; stadium and arena construction; commercial construction; design-build; demucking; dredging; earthwork; force mains; foundation excavation/backfill; gravity sewer; landfill construction; lift stations; playfield construction; riprap soil stabilization;sanitary sewer; site clearing; underground utility construction; value engineering; water mains.
Scope of work: Project highlights include pavement reconstruction of 1.93 miles of five lane undivided roadway along SR-7/NW 7th Avenue including installation of 19,000 feet of Storm Sewer pipe, 31,800 feet of Water/Sewer pipe, (14) Deep Injection Wells, new concrete curb and sidewalk, and new signalization and lighting. Project located along a densely populated commercial corridor with heavy vehicular and pedestrian traffic. Project constructed in (6) phases in order to maintain vehicular and pedestrian traffic along both sides of roadway at all times.
Scope of work: Complete removal and Reconstruction along SR-823/NW 57th Avenue/Road/Red Road from West 65th Street to West 84th Street and intersection improvements at NW 138th Street.
Scope of work: Project highlights include the construction of approximately 2.86 miles of new divided highway including storm drainage, earthwork, paving, barrier wall, lighting, striping and signage, and fencing. The construction of bridges and reinforced earth walls.
Scope of work: Project highlights include the construction of approximately 2 miles of new 4 lane roadway including storm drainage, earthwork, paving, curbing and walks, signal and lighting, striping and signage, and landscaping. The reconstruction of major intersection and parts of adjacent roadways.
Scope of work: Project highlights include the construction of approximately 6.2 miles of new 2-3 lane roadway including storm drainage, earthwork, soil contamination remediation, paving, curbing and walks, signal and lighting, striping and signage, and landscaping. The reconstruction of major intersection and parts of adjacent roadways. Construction of two (2) bridges and seventeen (17) bus shelters.
Scope of work: Project highlights include the construction of approximately 2.5 miles of new 2-3 lane roadway including storm drainage, earthwork, paving, curbing and walks, signal and lighting, striping and signage, and landscaping. Construction of two bridges and eight (8) bus shelters. Reconstruction and widening of US1 adjacent to the busway including storm drainage, earthwork, asphalt overbuild and paving, curbing and walks, signal and lighting, striping and signage, and landscaping.
Scope of work: Project highlights include the construction of approximately 2.5 miles of new 2-3 lane roadway including storm drainage, earthwork, paving, curbing and walks, signal and lighting, striping and signage, and landscaping. Construction of two (2) bridges and three (3) bus shelters. Reconstruction and widening of US1 adjacent to the busway including storm drainage, earthwork, asphalt overbuild and paving, curbing and walks, signal and lighting, striping and signage, and landscaping.
Scope of work: Project highlights include the complete roadway and drainage reconstruction of 79th Avenue. Total upgrade of the sanitary sewer system. Installation of new 36-inch D.I.P. force main along 79th Avenue between N.W. 25th Street to 58th Street. Construction of new drainage and exfiltration. Roadway widening improvements, curbs and walks, signalization and lighting, asphalt paving.
Scope of work: Project highlights include the construction of approximately 5 miles of new 2-3 lane roadway including storm drainage, earthwork, paving, curbing and walks, signal and lighting, striping and signage.
... and surrounding communities