Highway Construction

Central Civil Construction Florida

Central Civil Construction has completed dozens of projects for businesses and government organizations in South Florida. Central Civil capabilities include: airport construction; seaport construction; utility/infrastructure construction; environmental construction; highway construction; stadium and arena construction; commercial construction; design-build; demucking; dredging; earthwork; force mains; foundation excavation/backfill; gravity sewer; landfill construction; lift stations; playfield construction; riprap soil stabilization;sanitary sewer; site clearing; underground utility construction; value engineering; water mains.

Central Civil Construction Florida

SR 7/US 441 from NW 8 St to NW 36 — Miami

  • Date:  September 2015 – November 2017
  • Contract Amount:  $21.5M
  • Owner:  Florida Department of Transportation
  • Prime Contractor:  Central Civil Construction

Scope of work: Project highlights include pavement reconstruction of 1.93 miles of five lane undivided roadway along SR-7/NW 7th Avenue including installation of 19,000 feet of Storm Sewer pipe, 31,800 feet of Water/Sewer pipe, (14) Deep Injection Wells, new concrete curb and sidewalk, and new signalization and lighting. Project located along a densely populated commercial corridor with heavy vehicular and pedestrian traffic. Project constructed in (6) phases in order to maintain vehicular and pedestrian traffic along both sides of roadway at all times.

SR 823 (NW 57th Ave.) from West 65th Street to West 84th Street, and at Northwest 138th Street

  • Date:  January 2015 – May 2017
  • Contract Amount:  $20.8M
  • Owner:  Florida Department of Transportation
  • Prime Contractor:  Central Civil Construction

Scope of work: Complete removal and Reconstruction along SR-823/NW 57th Avenue/Road/Red Road from West 65th Street to West 84th Street and intersection improvements at NW 138th Street.

SR5 US1 — Key Largo

  • Date:  September 2009 – October 2011
  • Contract Amount:  $15.9M
  • Owner:  Florida Department of Transportation
  • Prime Contractor:  Central Civil Construction

Scope of work: Project highlights include the construction of approximately 2.86 miles of new divided highway including storm drainage, earthwork, paving, barrier wall, lighting, striping and signage, and fencing. The construction of bridges and reinforced earth walls.

SR5 Biscayne Blvd. — Miami

  • Date:  January 2006 – May 2007
  • Contract Amount:  $13.2M
  • Owner:  Florida Department of Transportation
  • Prime Contractor:  Central Civil Construction

Scope of work: Project highlights include the construction of approximately 2 miles of new 4 lane roadway including storm drainage, earthwork, paving, curbing and walks, signal and lighting, striping and signage, and landscaping. The reconstruction of major intersection and parts of adjacent roadways.

US1 Bus Lanes Segment II — Homestead/Florida City

  • Date:  October 2005 – July 2008
  • Contract Amount:  $36.6M
  • Owner:  Miami Dade County Transit
  • Prime Contractor:  Central Civil Construction

Scope of work: Project highlights include the construction of approximately 6.2 miles of new 2-3 lane roadway including storm drainage, earthwork, soil contamination remediation, paving, curbing and walks, signal and lighting, striping and signage, and landscaping. The reconstruction of major intersection and parts of adjacent roadways. Construction of two (2) bridges and seventeen (17) bus shelters.

US1 Bus Lanes Segment I North — Miami

  • Date:  July 2003 – July 2005
  • Contract Amount:  $19.7M
  • Owner:  Miami Dade County Transit
  • Prime Contractor:  Central Civil Construction

Scope of work: Project highlights include the construction of approximately 2.5 miles of new 2-3 lane roadway including storm drainage, earthwork, paving, curbing and walks, signal and lighting, striping and signage, and landscaping. Construction of two bridges and eight (8) bus shelters. Reconstruction and widening of US1 adjacent to the busway including storm drainage, earthwork, asphalt overbuild and paving, curbing and walks, signal and lighting, striping and signage, and landscaping.

US1 Bus Lanes Segment I South — Miami

  • Date:  November 2002 – May 2004
  • Contract Amount:  $17.6M
  • Owner:  Miami Dade County Transit
  • Prime Contractor:  Central Civil Construction

Scope of work: Project highlights include the construction of approximately 2.5 miles of new 2-3 lane roadway including storm drainage, earthwork, paving, curbing and walks, signal and lighting, striping and signage, and landscaping. Construction of two (2) bridges and three (3) bus shelters. Reconstruction and widening of US1 adjacent to the busway including storm drainage, earthwork, asphalt overbuild and paving, curbing and walks, signal and lighting, striping and signage, and landscaping.

N.W. 79th Avenue — Miami

  • Date:  1997 - 1998
  • Contract Amount:  $4.1M
  • Owner:  Miami Dade County Public Works
  • Prime Contractor:  Central Civil Construction

Scope of work: Project highlights include the complete roadway and drainage reconstruction of 79th Avenue. Total upgrade of the sanitary sewer system. Installation of new 36-inch D.I.P. force main along 79th Avenue between N.W. 25th Street to 58th Street. Construction of new drainage and exfiltration. Roadway widening improvements, curbs and walks, signalization and lighting, asphalt paving.

US1 Bus Lanes — DOT Project #87020-3551

  • Date:  1996 — 1998
  • Owner:  Florida Department of Transportation
  • Prime Contractor:  Central Civil Construction
  • Contract Amount:  $5.8M

Scope of work: Project highlights include the construction of approximately 5 miles of new 2-3 lane roadway including storm drainage, earthwork, paving, curbing and walks, signal and lighting, striping and signage.