  EAA A-1 Flow Equalization (FEB)  

Project Owner:  South Florida Water Management District

Contract Amount:  $59.9M

Engineer of Record:  WRS Compass

General Contractor:  Central Civil

With an overall project area of 15,000 acres, the EAA A-1 Flow Equalization (FEB) is designed to capture and store peak stormwater flows during the wet season or heavy rainfall events. The project encompasses installation of 2.1 million Cubic Yards of fill toconstruct 21 miles of levee, degrading 3.1 million Cubic Yards of muck, backfilling 113 miles of agricultural canals and construction of 14 gated water control structures.